Commercial & Industrial Solar in Billingham (TS23)
Data-driven view of commercial solar potential in the TS23 postcode district. We track 1,338 active commercial and industrial businesses in this area, with 298 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
1,338
commercial & industrial
Annual yield
945
kWh per kWp installed
Solar planning 12m
1
0% approved
Avg DEC rating
D
298 certificates
Solar potential in Billingham (TS23)
A typical south-facing roof in TS23 produces approximately 945 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 236 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 1 solar planning applications have been submitted in the TS23 area, with an approval rate of 0%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in TS23
The top commercial sector groups by active business count in this postcode district are:
- Real estate, 377 active businesses
- Specialised construction, 79 active businesses
- Retail trade, 64 active businesses
- Food service, 63 active businesses
- Architecture/engineering, 62 active businesses
Free solar assessment for a site in Billingham (TS23)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in Billingham (TS23)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →