Commercial & Industrial Solar in Chard (TA20)
Data-driven view of commercial solar potential in the TA20 postcode district. We track 653 active commercial and industrial businesses in this area, with 106 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
653
commercial & industrial
Annual yield
1,036
kWh per kWp installed
Solar planning 12m
0
0% approved
Avg DEC rating
C
106 certificates
Solar potential in Chard (TA20)
A typical south-facing roof in TA20 produces approximately 1,036 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 259 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Commercial activity mix in TA20
The top commercial sector groups by active business count in this postcode district are:
- Human health, 72 active businesses
- Real estate, 62 active businesses
- Retail trade, 47 active businesses
- Specialised construction, 40 active businesses
- Construction of buildings, 39 active businesses
Wider area
The TA20 postcode district sits within SOMERSET. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.
Free solar assessment for a site in Chard (TA20)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in Chard (TA20)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →