Commercial & Industrial Solar in Rayleigh (SS6)

Data-driven view of commercial solar potential in the SS6 postcode district. We track 2,276 active commercial and industrial businesses in this area, with 245 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.

Active C&I businesses

2,276

commercial & industrial

Annual yield

1,072

kWh per kWp installed

Solar planning 12m

0

0% approved

Avg DEC rating

D

245 certificates

Solar potential in Rayleigh (SS6)

A typical south-facing roof in SS6 produces approximately 1,072 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 268 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.

Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.

Commercial activity mix in SS6

The top commercial sector groups by active business count in this postcode district are:

  • Real estate, 300 active businesses
  • Specialised construction, 248 active businesses
  • Retail trade, 131 active businesses
  • Business support, 125 active businesses
  • Management consulting, 118 active businesses

Wider area

The SS6 postcode district sits within ESSEX. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.

Free solar assessment for a site in Rayleigh (SS6)

Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.

By submitting, you agree to our privacy policy.

Sectors with strongest solar match in this area

Assessing solar for a site in Rayleigh (SS6)?

MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.

Open the MTFD Portal →