Commercial & Industrial Solar in Basildon (SS16)

Data-driven view of commercial solar potential in the SS16 postcode district. We track 1,187 active commercial and industrial businesses in this area, with 172 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.

Active C&I businesses

1,187

commercial & industrial

Annual yield

1,065

kWh per kWp installed

Solar planning 12m

1

100% approved

Avg DEC rating

D

172 certificates

Solar potential in Basildon (SS16)

A typical south-facing roof in SS16 produces approximately 1,065 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 266 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.

Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.

Planning context

Over the last 12 months, 1 solar planning applications have been submitted in the SS16 area, with an approval rate of 100%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.

Commercial activity mix in SS16

The top commercial sector groups by active business count in this postcode district are:

  • Real estate, 158 active businesses
  • Specialised construction, 147 active businesses
  • Human health, 97 active businesses
  • Retail trade, 87 active businesses
  • IT services, 69 active businesses

Free solar assessment for a site in Basildon (SS16)

Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.

By submitting, you agree to our privacy policy.

Sectors with strongest solar match in this area

Assessing solar for a site in Basildon (SS16)?

MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.

Open the MTFD Portal →