Commercial & Industrial Solar in Hook (RG29)

Data-driven view of commercial solar potential in the RG29 postcode district. We track 442 active commercial and industrial businesses in this area, with 61 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.

Active C&I businesses

442

commercial & industrial

Annual yield

1,026

kWh per kWp installed

Solar planning 12m

1

0% approved

Avg DEC rating

C

61 certificates

Solar potential in Hook (RG29)

A typical south-facing roof in RG29 produces approximately 1,026 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 257 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.

Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.

Planning context

Over the last 12 months, 1 solar planning applications have been submitted in the RG29 area, with an approval rate of 0%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.

Commercial activity mix in RG29

The top commercial sector groups by active business count in this postcode district are:

  • Management consulting, 47 active businesses
  • Real estate, 34 active businesses
  • Other professional, 31 active businesses
  • Retail trade, 30 active businesses
  • Specialised construction, 27 active businesses

Wider area

The RG29 postcode district sits within HAMPSHIRE. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.

Free solar assessment for a site in Hook (RG29)

Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.

By submitting, you agree to our privacy policy.

Sectors with strongest solar match in this area

Assessing solar for a site in Hook (RG29)?

MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.

Open the MTFD Portal →