Commercial & Industrial Solar in St. Ives (PE27)
Data-driven view of commercial solar potential in the PE27 postcode district. We track 2,185 active commercial and industrial businesses in this area, with 170 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
2,185
commercial & industrial
Annual yield
1,038
kWh per kWp installed
Solar planning 12m
1
0% approved
Avg DEC rating
C
170 certificates
Solar potential in St. Ives (PE27)
A typical south-facing roof in PE27 produces approximately 1,038 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 260 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 1 solar planning applications have been submitted in the PE27 area, with an approval rate of 0%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in PE27
The top commercial sector groups by active business count in this postcode district are:
- Real estate, 281 active businesses
- Specialised construction, 148 active businesses
- Management consulting, 136 active businesses
- Business support, 126 active businesses
- Construction of buildings, 115 active businesses
Free solar assessment for a site in St. Ives (PE27)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in St. Ives (PE27)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →