Commercial & Industrial Solar in London (NW2)
Data-driven view of commercial solar potential in the NW2 postcode district. We track 6,121 active commercial and industrial businesses in this area, with 303 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
6,121
commercial & industrial
Annual yield
1,025
kWh per kWp installed
Solar planning 12m
15
100% approved
Avg DEC rating
D
303 certificates
Solar potential in London (NW2)
A typical south-facing roof in NW2 produces approximately 1,025 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 256 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 15 solar planning applications have been submitted in the NW2 area, with an approval rate of 100%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in NW2
The top commercial sector groups by active business count in this postcode district are:
- Real estate, 1,137 active businesses
- Retail trade, 568 active businesses
- Specialised construction, 395 active businesses
- Construction of buildings, 363 active businesses
- Food service, 294 active businesses
Free solar assessment for a site in London (NW2)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in London (NW2)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →