Commercial & Industrial Solar in London (N11)
Data-driven view of commercial solar potential in the N11 postcode district. We track 3,447 active commercial and industrial businesses in this area, with 163 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
3,447
commercial & industrial
Annual yield
1,025
kWh per kWp installed
Solar planning 12m
2
50% approved
Avg DEC rating
D
163 certificates
Solar potential in London (N11)
A typical south-facing roof in N11 produces approximately 1,025 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 256 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 2 solar planning applications have been submitted in the N11 area, with an approval rate of 50%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in N11
The top commercial sector groups by active business count in this postcode district are:
- Real estate, 517 active businesses
- Construction of buildings, 244 active businesses
- Retail trade, 240 active businesses
- Specialised construction, 225 active businesses
- Other services, 210 active businesses
Free solar assessment for a site in London (N11)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in London (N11)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →