Commercial & Industrial Solar in Maidstone (ME16)

Data-driven view of commercial solar potential in the ME16 postcode district. We track 2,407 active commercial and industrial businesses in this area, with 433 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.

Active C&I businesses

2,407

commercial & industrial

Annual yield

1,059

kWh per kWp installed

Solar planning 12m

2

0% approved

Avg DEC rating

D

433 certificates

Solar potential in Maidstone (ME16)

A typical south-facing roof in ME16 produces approximately 1,059 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 265 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.

Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.

Planning context

Over the last 12 months, 2 solar planning applications have been submitted in the ME16 area, with an approval rate of 0%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.

Commercial activity mix in ME16

The top commercial sector groups by active business count in this postcode district are:

  • Real estate, 225 active businesses
  • Specialised construction, 206 active businesses
  • Other services, 153 active businesses
  • Management consulting, 146 active businesses
  • Financial services, 144 active businesses

Wider area

The ME16 postcode district sits within KENT. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.

Free solar assessment for a site in Maidstone (ME16)

Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.

By submitting, you agree to our privacy policy.

Sectors with strongest solar match in this area

Assessing solar for a site in Maidstone (ME16)?

MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.