Commercial & Industrial Solar in Manchester (M34)
Data-driven view of commercial solar potential in the M34 postcode district. We track 1,908 active commercial and industrial businesses in this area, with 303 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
1,908
commercial & industrial
Annual yield
860
kWh per kWp installed
Solar planning 12m
1
100% approved
Avg DEC rating
D
303 certificates
Solar potential in Manchester (M34)
A typical south-facing roof in M34 produces approximately 860 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 215 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 1 solar planning applications have been submitted in the M34 area, with an approval rate of 100%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in M34
The top commercial sector groups by active business count in this postcode district are:
- Retail trade, 214 active businesses
- Real estate, 208 active businesses
- Specialised construction, 160 active businesses
- IT services, 102 active businesses
- Food service, 95 active businesses
Free solar assessment for a site in Manchester (M34)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in Manchester (M34)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →