Commercial & Industrial Solar in Bury St. Edmunds (IP33)
Data-driven view of commercial solar potential in the IP33 postcode district. We track 1,104 active commercial and industrial businesses in this area, with 499 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
1,104
commercial & industrial
Annual yield
1,044
kWh per kWp installed
Solar planning 12m
3
100% approved
Avg DEC rating
C
499 certificates
Solar potential in Bury St. Edmunds (IP33)
A typical south-facing roof in IP33 produces approximately 1,044 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 261 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 3 solar planning applications have been submitted in the IP33 area, with an approval rate of 100%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in IP33
The top commercial sector groups by active business count in this postcode district are:
- Real estate, 141 active businesses
- Retail trade, 95 active businesses
- Food service, 78 active businesses
- IT services, 76 active businesses
- Financial services, 69 active businesses
Wider area
The IP33 postcode district sits within SUFFOLK. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.
Free solar assessment for a site in Bury St. Edmunds (IP33)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in Bury St. Edmunds (IP33)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →