Commercial & Industrial Solar in Stonehouse (GL10)
Data-driven view of commercial solar potential in the GL10 postcode district. We track 1,293 active commercial and industrial businesses in this area, with 111 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.
Active C&I businesses
1,293
commercial & industrial
Annual yield
1,003
kWh per kWp installed
Solar planning 12m
4
0% approved
Avg DEC rating
D
111 certificates
Solar potential in Stonehouse (GL10)
A typical south-facing roof in GL10 produces approximately 1,003 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 251 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.
Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.
Planning context
Over the last 12 months, 4 solar planning applications have been submitted in the GL10 area, with an approval rate of 0%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.
Commercial activity mix in GL10
The top commercial sector groups by active business count in this postcode district are:
- Specialised construction, 94 active businesses
- Real estate, 93 active businesses
- Management consulting, 88 active businesses
- Retail trade, 76 active businesses
- Business support, 69 active businesses
Wider area
The GL10 postcode district sits within GLOUCESTERSHIRE. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.
Free solar assessment for a site in Stonehouse (GL10)
Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.
Sectors with strongest solar match in this area
Assessing solar for a site in Stonehouse (GL10)?
MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.
Open the MTFD Portal →