Commercial & Industrial Solar in Fleetwood (FY7)

Data-driven view of commercial solar potential in the FY7 postcode district. We track 911 active commercial and industrial businesses in this area, with 267 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.

Active C&I businesses

911

commercial & industrial

Annual yield

1,005

kWh per kWp installed

Solar planning 12m

3

0% approved

Avg DEC rating

D

267 certificates

Solar potential in Fleetwood (FY7)

A typical south-facing roof in FY7 produces approximately 1,005 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 251 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.

Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.

Planning context

Over the last 12 months, 3 solar planning applications have been submitted in the FY7 area, with an approval rate of 0%. This is a signal of local planning authority appetite for solar, installers and funders should factor this into risk assessments for new projects.

Commercial activity mix in FY7

The top commercial sector groups by active business count in this postcode district are:

  • Real estate, 120 active businesses
  • Specialised construction, 105 active businesses
  • Retail trade, 95 active businesses
  • Business support, 45 active businesses
  • Food service, 41 active businesses

Free solar assessment for a site in Fleetwood (FY7)

Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.

By submitting, you agree to our privacy policy.

Sectors with strongest solar match in this area

Assessing solar for a site in Fleetwood (FY7)?

MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.

Open the MTFD Portal →