Commercial & Industrial Solar in Billericay (CM12)

Data-driven view of commercial solar potential in the CM12 postcode district. We track 3,084 active commercial and industrial businesses in this area, with 203 Display Energy Certificates on record. Designed for installers, landlords, and funders assessing where to deploy solar PPA projects.

Active C&I businesses

3,084

commercial & industrial

Annual yield

1,065

kWh per kWp installed

Solar planning 12m

0

0% approved

Avg DEC rating

D

203 certificates

Solar potential in Billericay (CM12)

A typical south-facing roof in CM12 produces approximately 1,065 kWh per kWp of installed capacity each year. For a mid-sized commercial installation of 250 kWp, that translates to roughly 266 MWh of generation each year, enough to offset a significant portion of typical warehouse, logistics, or light-industrial electricity demand.

Actual yield varies with roof orientation, pitch, shading, and inverter efficiency. The figure above represents clear-sky, unshaded south-facing potential.

Commercial activity mix in CM12

The top commercial sector groups by active business count in this postcode district are:

  • Specialised construction, 369 active businesses
  • Real estate, 334 active businesses
  • Management consulting, 250 active businesses
  • Business support, 199 active businesses
  • Construction of buildings, 173 active businesses

Wider area

The CM12 postcode district sits within ESSEX. Grid connection capacity and planning trends at the wider council level are a material input into any commercial solar project in the area.

Free solar assessment for a site in Billericay (CM12)

Tell us about your site, we'll come back within 1 working day with an indicative PPA rate, payback estimate, and what would be needed to take it forward.

By submitting, you agree to our privacy policy.

Sectors with strongest solar match in this area

Assessing solar for a site in Billericay (CM12)?

MTFD places commercial solar projects across our institutional funding panel. No upfront cost; we handle development, funding, and operations.

Open the MTFD Portal →